Energy & Solar · 2025
Solar Power Project Brief (18 March 2025)
موجز مشروع الطاقة الشمسية (18 مارس 2025)
- Format
- PDF · 0.3 MB
- Language
- English
- Year
- 2025
Executive Summary
This project brief of 18 March 2025 summarises the status of a utility-scale solar power project in Iraq with a total capacity of 1,000 megawatts. The project is divided into four or five sites, depending on land availability and the capacity of transmission lines to connect to the national grid, with a separate investment licence for each site. Three sites had already been reserved and registered, with two more in progress, and the current milestone requires 25% of the stations to be completed and grid-connected by July to unlock additional privileges. Once the investment licence is issued, a power purchase agreement is to be signed with the Ministry of Electricity, backed by a government guarantee valid for one year and renewable automatically for the project's 25-year life. Electricity would be purchased at no less than 4 US cents per kilowatt-hour, with revenues calculated on 3,000 operating hours a year. Realistic check: fixed-tilt PV in Iraq yields about 1,800–2,100 full-load hours a year (base case 1,900 h), so 1,000 MW produces about 1,900 GWh and roughly US$76 million a year at 4 cents (range US$72–84 million), compared with US$120 million on the 3,000-hour basis; the 3,000 hours hold only if the contract pays for deemed hours or the plant adds storage. The brief specifies the documents required for the next stage — a signed partnership agreement with the executing company, an official financial support letter from the funding institution and a company profile with comparable references. It offers developers and investors a clear view of the contractual and bankability conditions under which large-scale solar projects are being structured in Iraq.
View only — available on this website